Dry screed. Any floor. Any requirement.

The tried-and-tested system solution for floor structures in new-build and renovation projects.

Whether it’s a timber-beamed ceiling in an old building or a concrete ceiling in a new build – for every type of substrate and every application ​A tried-and-tested, reliable solution is available. ​Quick to lay, ready to walk on straight away and ready for carpeting after 24 hours!​

Dry screeds offer a wide range of benefits for the design of floor structures, which are particularly evident in terms of building physics, cost-effectiveness and sustainability.

The dry installation method, which requires no water, the fact that the floor can be walked on immediately, and the low weight per unit area ensures a quick and smooth construction process.

No drying times – no water ingress

Dry installation means: no moisture in the building structure. This protects sensitive substrates and prevents the risk of mould caused by trapped water.

Can be walked on immediately after laying

Once the joints have been sealed, the floor is ready. Subsequent trades can begin immediately – no loss of construction time, no downtime on site.

Low floor load on the structural slabs

With a density of 23 kg/m² or more, dry screeds can be laid even on structurally challenging types of sub-floors with limited load-bearing capacity.

Why architects and building owners choose fermacell™ flooring systems

Our products play a key role in ensuring efficiency. From the subfloor to the floor covering – every requirement has been carefully considered. We support designers and installers in selecting the right system and finding the ideal installation method for every project.

Lightweight and capable of carrying heavy loads

Suitable for use on any load-bearing ceiling from approx. 23 kg/m². Tested load-bearing capacities for all standard applications – from residential to commercial use.

Any surface

Wooden beams, concrete, OSB, steel, uneven surfaces – the fermacell™ levelling system provides a safe, standard-compliant base on any surface.

Damp room. No problem ​ ​

Tested solutions for bathrooms, saunas and wet areas – including cement-bound dry screed for specific requirements.

Living space comfort

Only natural materials, no synthetic binders. Certified as suitable for healthy living. Plaster actively regulates humidity – ensuring a consistently comfortable indoor climate.

All types of flooring are possible.

Parquet, tiles, vinyl, natural stone, large-format tiles – we have certified installation instructions for every type of flooring. We have the answer to everything.

Complete planning certainty.

Comprehensive approvals for structural engineering, fire safety and sound insulation. All documentation provided from a single source – from tendering to final acceptance.

When it comes to flooring, we leave nothing to chance.

Every floor is different. Different ceiling, different load-bearing capacity, different flooring, different requirements. fermacell® doesn’t have just one solution for this diversity – but many.

Tested, documented, predictable.

Five typical soil profiles

Dry screed on a timber-beamed ceiling, bathroom refurbishment, sound insulation in accordance with DIN 4109 – every building project has its own specific requirements.

fermacell® has the tried-and-tested system for this. Five floor structures from real-world planning projects. Proven, durable and fault-free installation.

Existing timber-beamed ceiling — a standard solution for loft conversions

Requirement:
Soundproofing & fire safety requirements, minimum installation height – on an old wooden beam ceiling with limited load-bearing capacity. ​

Solution: ​
2E35 – fermacell™® Dry screed element on levelling bed, from 35 mm​

  • Weight per square metre from 23 kg/m²

  • A2 non-combustible

  • F90 Fire Protection

  • Sound insulation in accordance with DIN 4109

  • ready for tiling and walkable after 24 hours,

  • No moisture ingress

Renovation of wet rooms

Requirement:
Mould-resistant flooring system for commercial kitchens, communal shower areas and wellness facilities; quick installation

Solution:
fermacell™® Powerpanel TE – cement-based building board on a bound aggregate base ​

  • Mould-resistant

  • water-resistant

  • ready for use after 24 hours

  • for every type of exposed ceiling

  • increased payloads possible

Brochure: Planning and Installation of Flooring, page 43

School refurbishment

Requirement:
Renovation is only possible within a limited timeframe; high load-bearing capacities are required; tight deadlines; sound and fire protection requirements must be met

Solution:
2E31 fermacell™® Dry screed element on levelling bed, third layer for school corridors

  • Laid without water

  • Ready for use and walkable after 24 hours; no drying time required

  • Weight per square metre from 23 kg/m²

  • Sound and fire safety requirements met

  • flexible connections to existing components

Floors in residential buildings

Requirement:
Fixed installation height required, sound insulation in accordance with DIN 4109, options for top coverings

Solution:
2E35 - fermacell™® Dry screed element on a levelling bed

  • High stability

  • Sound insulation in accordance with DIN 4109

  • Fire safety included

  • all common types of surface covering have been tested

Link Puv Floor – page 64

Large-format tiles

Requirement:
Tiles with an edge length of 60 cm or more, insulation material, ceiling type and screed must all be compatible with one another. ​

Solution:
2E31 - fermacell®® Dry screed element on 40 mm compacted fill, concrete slab

  • Tested for edge lengths up to 80 cm

  • With 3 layers, the edge length can be unlimited

  • Consultation with the technical team is recommended

Discuss the project directly

With us right from the start. For a long-lasting floor.

We provide support right from the early planning stages – with our tools, our system expertise and a dedicated point of contact. This ensures there are no gaps between planning and implementation. ​