MK East School and Community Hub 03

Allen Edwards School

Building schools for the future with fermacell® fibre gypsum boards.

Project at a glance

Achieving Passivhaus with fermacell® fibre gypsum boards

The new school, which was designed by Lee Evans Partnership and project managed by Galliford Try, has been completed on time as part of the UK Government’s PSBP programme.

Sub-contractor MiddleSex Ltd chose 3,000m2 of fermacell® fibre gypsum boards for the internal partitions and linings, because of its high performance properties including its excellent fire and acoustic ratings, ease of fixing, cutting and jointing and high quality finish. Using fermacell™ Fine Surface Treatment to finish the boards meant there was no need for plastering and the partitions were ready to paint and decorate within 45 minutes.

The original specification included double layer plasterboard, therefore, changing to fermacell meant only a single layer system was required which allowed for narrow width partitions - saving room space and time, whilst reducing material on-site. As the project was constructed under strict social distancing measures due to COVID-19, use of fermacell board ensured that there was no additional trades required.

Key results by using fermacell® fibre gypsum boards
One board does it all

Direct hanging weight capability of up to 150kg per linear metre.

Enhanced Fire Safety

60-minute fire rating and non-combustible A2 materials.

Beyond Severe Duty Rating

Internal partitions exceed ‘severe duty’ standards, with enhanced wall build-ups and Lateral Crowd Loading data to withstand impact from equipment and mobility aids.

Sustainable Construction

Bio-CO2 storage and material reuse strategies will further reduce whole-life carbon.

Trust it. Build with it.

Discover fermacell® fibre gypsum boards for your next project.